Project description
Dismantling of injection PAD 1, preserving equipment, protecting client assets and safely disposing of waste.
Among the tasks carried out are:
• Dismantling of facilities.
• Final waste disposal.
• Equipment preservation.
- Date: February 10, 2015
- Client: Ecopetrol S.A.
- Category: ingles



![[obs.com.co][837]man](https://www.obs.com.co/wp-content/uploads/2023/11/obs.com_.co837man.jpg)