Project description
Basic and detailed engineering, facility construction, installation, national and international logistics, start-up, pre-commissioning, commissioning, operation and maintenance of a 100 KBPD pumping unit.
For a total for the expansion of the pumping system
of crude oil of 175 KBPD. This facility was owned by O.B.S LTDA and thanks to its performance it was transferred to ECOPETROL S.A., it is currently in operation and is located in the CASTILLA VIT field, in the department of Meta.
The operation and maintenance of the pumping system is in charge of OIL
BUSINESS SERVICES LTDA., since 2010 in the Castilla VIT field.
- Date: February 10, 2015
- Client: Ecopetrol S.A.
- Category: ingles