EPC - Tiempos de entrega agresivos.
The project was executed in 4 months, which is a record considering that the scope involved engineering development.
Among the tasks carried out are:
- Basic and detailed engineering.
- Manufacturing and installation of structures.
- Civil works.
- Installation of electrical equipment and materials.
- Wiring and connection.
- Pre-commissioning and commissioning.
- Supply of materials.
- Date: February 10, 2015
- Client: Ecopetrol S.A.